Institutional/Public Project Case Study

BJP District Office — Bhongir

Location: Bhongir, Telangana | Completion: In Progress

Project Overview

Under construction G+2 district party office building for BJP in Bhongir, Telangana, featuring structural RCC frames, external scaffolding for plastering, and internal utility conduit routing.

Scope of Civil Works

  • Erecting a multi-level reinforced cement concrete (RCC) structural frame.
  • Assembling full-height wood pole scaffolding for exterior plastering and finishes.
  • Installing window frame modules and executing brickwork partitions.
  • Configuring internal electrical wiring, switchboxes, and primary utility conduit routing.

Technical Challenges Faced

Coordinating internal utility line routing and exterior plastering concurrently while maintaining strict site safety on multi-level scaffolding.

Engineering Solutions Deployed

Scheduled interior electrical work and exterior plastering in staggered shifts, using safety harnesses and stable working platforms.

Field Operations PWA

Project Planning Workspace

Interactive field tracking for site supervisors, quality audits, and milestone completion verification (BJP District Office — Bhongir • Bhongir, Telangana).

Site Telemetry: Active

Construction Stage Pipeline

Field-friendly milestone tracking. Drag sliders to log verified completion percentages directly from site.

Glove-Friendly Touch
Stage 01
100%

Topographic contour survey, GHMC perimeter hoarding, rock mechanical trenching, and PCC mud mat.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 02
100%

Tata Tiscon Fe550D rebar fabrication, anti-termite chemical soil injection, and raft slab pour.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 03
75%

RCC columns shuttering, M30 ready-mix transit pour, PT slab tensioning, and 21-day pond curing.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 04
40%

Autoclaved AAC / Red brick partitions, dual coat external waterproof plastering with Dr. Fixit admixtures.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 05
20%

Concealed PVC electrical conduits (Sudhakar), CPVC plumbing lines (Ashirvad), and HVAC duct sleeves.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 06
0%

Vitrified tiles / epoxy floor laying, premium weather-coat paint, electrical fixtures, and client key handover.

0% Initiated 50% In Progress 100% Milestone Achieved