Institutional/Public Project Case Study

BJP District Office — Medak

Location: Medak District, Telangana | Completion: December 2024

Project Overview

District-level party office construction with a clean institutional façade and functional layout.

Scope of Civil Works

  • Erecting a multi-level commercial reinforced cement concrete (RCC) structural frame.
  • Executing interior partition walls and flooring works for multiple office suites.
  • Installing glass window modules and double-door entrance corridors.
  • Configuring plumbing, electrical, and HVAC conduit networks.
  • Finishing exterior walls with weather-proof institutional paint styling.

Technical Challenges Faced

Constructing a secure public-institutional building in a developing district under tight timeline mandates for active occupancy.

Engineering Solutions Deployed

Deployed advanced concrete curing methods and coordinated parallel tracks for structural and finishing teams to speed up completion.

Field Operations PWA

Project Planning Workspace

Interactive field tracking for site supervisors, quality audits, and milestone completion verification (BJP District Office — Medak • Medak District, Telangana).

Site Telemetry: Active

Construction Stage Pipeline

Field-friendly milestone tracking. Drag sliders to log verified completion percentages directly from site.

Glove-Friendly Touch
Stage 01
100%

Topographic contour survey, GHMC perimeter hoarding, rock mechanical trenching, and PCC mud mat.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 02
100%

Tata Tiscon Fe550D rebar fabrication, anti-termite chemical soil injection, and raft slab pour.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 03
75%

RCC columns shuttering, M30 ready-mix transit pour, PT slab tensioning, and 21-day pond curing.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 04
40%

Autoclaved AAC / Red brick partitions, dual coat external waterproof plastering with Dr. Fixit admixtures.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 05
20%

Concealed PVC electrical conduits (Sudhakar), CPVC plumbing lines (Ashirvad), and HVAC duct sleeves.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 06
0%

Vitrified tiles / epoxy floor laying, premium weather-coat paint, electrical fixtures, and client key handover.

0% Initiated 50% In Progress 100% Milestone Achieved