Residential Project Case Study

Nandagiri Hills Premium Residence

Location: Nanda Giri Hills, Hyderabad | Completion: June 2023

Project Overview

A high-end residential duplex villa construction project in Jubilee Hills, Hyderabad. Designed for premium luxury living, this turn-key construction combines advanced civil engineering with exquisite structural and finish details.

Scope of Civil Works

  • Excavating rocky terrain and laying high-strength foundation.
  • Erecting G+2 reinforced cement concrete (RCC) structural frame.
  • Installing architectural wood cladding panel system and louvers.
  • Configuring bespoke glass balcony balustrades and glazing systems.
  • Plastering, utilities integration, and turn-key structural finishing.

Technical Challenges Faced

The site sits in a high-profile neighborhood requiring strict sound barriers and dust containment. Loading heavy materials was restricted to off-peak hours to avoid blocking local residential access.

Engineering Solutions Deployed

We established sound-dampening acoustic screens and mist-nozzle dust suppression zones. Materials delivery was scheduled using a computerized just-in-time system to coordinate night-time arrivals.

Field Operations PWA

Project Planning Workspace

Interactive field tracking for site supervisors, quality audits, and milestone completion verification (Nandagiri Hills Premium Residence • Nanda Giri Hills, Hyderabad).

Site Telemetry: Active

Construction Stage Pipeline

Field-friendly milestone tracking. Drag sliders to log verified completion percentages directly from site.

Glove-Friendly Touch
Stage 01
100%

Topographic contour survey, GHMC perimeter hoarding, rock mechanical trenching, and PCC mud mat.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 02
100%

Tata Tiscon Fe550D rebar fabrication, anti-termite chemical soil injection, and raft slab pour.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 03
75%

RCC columns shuttering, M30 ready-mix transit pour, PT slab tensioning, and 21-day pond curing.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 04
40%

Autoclaved AAC / Red brick partitions, dual coat external waterproof plastering with Dr. Fixit admixtures.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 05
20%

Concealed PVC electrical conduits (Sudhakar), CPVC plumbing lines (Ashirvad), and HVAC duct sleeves.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 06
0%

Vitrified tiles / epoxy floor laying, premium weather-coat paint, electrical fixtures, and client key handover.

0% Initiated 50% In Progress 100% Milestone Achieved