Industrial Project Case Study

Rane Madras Ltd

Location: Hyderabad, Telangana | Completion: July 2023

Project Overview

10,000 sq.ft corporate-industrial building with a bold red-and-white façade, projecting entrance canopy, horizontal banding for visual rhythm, and landscaped approach for an enhanced user experience.

Scope of Civil Works

  • Erecting a 10,000 sq.ft industrial RCC and steel structural frame.
  • Creating the iconic corporate red-and-white facade styling and horizontal aesthetic banding.
  • Fabricating and installing a projecting cantilevered steel canopy at the main entrance.
  • Executing interior factory floor partitions and heavy utility pipeline networks.
  • Developing a landscaped entryway and parking slots for staff and corporate guests.

Technical Challenges Faced

Integrating clean corporate office aesthetics with heavy-duty manufacturing facilities in a single continuous structure on a compressed timeline.

Engineering Solutions Deployed

Separated the administrative front-office via a cantilevered entrance canopy and custom horizontal visual bands, while constructing the factory wing with pre-fabricated PEB frames behind it.

Field Operations PWA

Project Planning Workspace

Interactive field tracking for site supervisors, quality audits, and milestone completion verification (Rane Madras Ltd • Hyderabad, Telangana).

Site Telemetry: Active

Construction Stage Pipeline

Field-friendly milestone tracking. Drag sliders to log verified completion percentages directly from site.

Glove-Friendly Touch
Stage 01
100%

Topographic contour survey, GHMC perimeter hoarding, rock mechanical trenching, and PCC mud mat.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 02
100%

Tata Tiscon Fe550D rebar fabrication, anti-termite chemical soil injection, and raft slab pour.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 03
75%

RCC columns shuttering, M30 ready-mix transit pour, PT slab tensioning, and 21-day pond curing.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 04
40%

Autoclaved AAC / Red brick partitions, dual coat external waterproof plastering with Dr. Fixit admixtures.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 05
20%

Concealed PVC electrical conduits (Sudhakar), CPVC plumbing lines (Ashirvad), and HVAC duct sleeves.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 06
0%

Vitrified tiles / epoxy floor laying, premium weather-coat paint, electrical fixtures, and client key handover.

0% Initiated 50% In Progress 100% Milestone Achieved