Industrial Project Case Study

Sandvik Mining & Rock Technology India Pvt Ltd

Location: Patancheru, Hyderabad | Completion: October 2023

Project Overview

Contemporary industrial campus featuring large-scale reflective glazing and clean geometric volumes. Designed to reflect Sandvik's corporate identity while prioritizing functionality and modern manufacturing aesthetics.

Scope of Civil Works

  • Erecting a large-scale structural steel framework and structural concrete foundations.
  • Installing high-performance reflective glazing and aluminum framing systems.
  • Constructing modern administrative workspaces, research areas, and production floors.
  • Integrating industrial-grade HVAC, high-voltage electrical distribution, and fire suppression systems.
  • Landscaping and paving surrounding utility corridors and campus approach pathways.

Technical Challenges Faced

Designing a corporate campus that meets the Sweden-based Swedish MNC's global safety and operational guidelines while accommodating heavy machinery loads and strict vibration isolation requirements.

Engineering Solutions Deployed

Engineered customized isolated raft foundations for manufacturing wings and high-performance curtain walls for administrative spaces. Coordinated material deliveries during off-peak hours to meet MNC site safety compliance.

Field Operations PWA

Project Planning Workspace

Interactive field tracking for site supervisors, quality audits, and milestone completion verification (Sandvik Mining & Rock Technology India Pvt Ltd • Patancheru, Hyderabad).

Site Telemetry: Active

Construction Stage Pipeline

Field-friendly milestone tracking. Drag sliders to log verified completion percentages directly from site.

Glove-Friendly Touch
Stage 01
100%

Topographic contour survey, GHMC perimeter hoarding, rock mechanical trenching, and PCC mud mat.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 02
100%

Tata Tiscon Fe550D rebar fabrication, anti-termite chemical soil injection, and raft slab pour.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 03
75%

RCC columns shuttering, M30 ready-mix transit pour, PT slab tensioning, and 21-day pond curing.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 04
40%

Autoclaved AAC / Red brick partitions, dual coat external waterproof plastering with Dr. Fixit admixtures.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 05
20%

Concealed PVC electrical conduits (Sudhakar), CPVC plumbing lines (Ashirvad), and HVAC duct sleeves.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 06
0%

Vitrified tiles / epoxy floor laying, premium weather-coat paint, electrical fixtures, and client key handover.

0% Initiated 50% In Progress 100% Milestone Achieved