Industrial Project Case Study

Voith Turbo — Drum Drive Project

Location: Cherlapally/Mallapur industrial belt | Completion: Recently Completed

Project Overview

Turnkey industrial civil construction and Pre-Engineered Building (PEB) enclosure for the Drum Drive Pulley manufacturing facility for Voith Turbo, a global German engineering leader. Executed in the Cherlapally/Mallapur industrial belt under rigorous industrial safety guidelines and exacting structural tolerances.

Scope of Civil Works

  • Subgrade excavation, boulder packing, and stone soling for heavy-load equipment foundations.
  • Casting reinforced cement concrete (RCC) footings and machinery pedestals with high-precision anchor bolts.
  • Fabrication and structural erection of heavy PEB steel columns, rafters, purlins, and crane runway beams.
  • Solid concrete block masonry construction with external weather-proof cement plastering.
  • Installation of industrial blue profiled sheet cladding, roofing, continuous louvers, and aluminium-glazed windows.
  • Site integration with outdoor yard gantry crane infrastructure, transit pathways, and stormwater drainage conduits.

Technical Challenges Faced

Accommodating heavy dynamic loads for drum drive manufacturing machinery and overhead gantry cranes within an active industrial plant. Adhering to strict German MNC technical tolerances, vibration isolation requirements, and zero-accident safety protocols.

Engineering Solutions Deployed

Engineered high-bearing stone soling and isolated concrete column footings anchored with high-tensile anchor bolts. Pre-fabricated and ultrasonic-tested structural steel components offsite, followed by precision on-site crane erection and phased civil masonry to ensure zero disruption to adjoining plant operations.

Field Operations PWA

Project Planning Workspace

Interactive field tracking for site supervisors, quality audits, and milestone completion verification (Voith Turbo — Drum Drive Project • Cherlapally/Mallapur industrial belt).

Site Telemetry: Active

Construction Stage Pipeline

Field-friendly milestone tracking. Drag sliders to log verified completion percentages directly from site.

Glove-Friendly Touch
Stage 01
100%

Topographic contour survey, GHMC perimeter hoarding, rock mechanical trenching, and PCC mud mat.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 02
100%

Tata Tiscon Fe550D rebar fabrication, anti-termite chemical soil injection, and raft slab pour.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 03
75%

RCC columns shuttering, M30 ready-mix transit pour, PT slab tensioning, and 21-day pond curing.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 04
40%

Autoclaved AAC / Red brick partitions, dual coat external waterproof plastering with Dr. Fixit admixtures.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 05
20%

Concealed PVC electrical conduits (Sudhakar), CPVC plumbing lines (Ashirvad), and HVAC duct sleeves.

0% Initiated 50% In Progress 100% Milestone Achieved
Stage 06
0%

Vitrified tiles / epoxy floor laying, premium weather-coat paint, electrical fixtures, and client key handover.

0% Initiated 50% In Progress 100% Milestone Achieved